2013 | Caltex Alkylation Unit Scan (HF Mitigation Project) | Caltex |
2013 | Springvale Coal CHPP Scan | Sedgman |
2013 | Tank 512 Kurnell | Giovenco |
2013 | Unity Sewer Pump Station | Unity Water |
2013 | PNG Chiller Units | VAE |
2013 | PNG Chiller Units | VAE |
2013 | BP Transfield | BP |
2013 | RTA Mill Chutes | RTA |
2013 | Cyanide Dry Scrubber Orica Yarwun | RTA |
2013 | Callide Power Station TAR | Callide Power Station |
2013 | Gladstone Entertainment Centre | ADCO Constructions |
2012 | BP Product Wharf | BP |
2012 | Patricks Traveller Scan | Patricks |
2012 | Orica Cyanide Plant Gladstone | Orica |
2012 | QAL Transfer Station | QAL |
2012 | Isom Unit Scanning Caltex | Caltex |
2012 | Tanks 145 and 613 | Saunders International |
2012 | Tank 205 | Saunders International |
2011 | RTA Yarwun tank deformation scans | Rio Tinto |
2011 | Saraji CHPP | Sedgman |
2011 | Tank Def 2051 | Saunders International |
2011 | Arrow Services – Pipeline entrance | Arrow Energy |
2011 | Peak Downs CHPP | Sedgman |
2011 | BP Refinery Intercon | BP |
2011 | South Walker Creek CHPP | Sedgman |
2011 | Curragh CHPP | Sedgman |
2010 | Ship Loaders 1 & 2 Gladstone Port | Gladstone Ports Corporation |
2010 | Bengalla CHPP | Sedgman |
2010 | Mt Isa Crushers | Sedgman |
2010 | Tank 166 Kernell refinery | Saunders International |
2010 | Shell Tank 6 | Shell |
2010 | Red Mountain CHPP | Sedgman |
2010 | East End mine plant | Cement Australia |
2010 | Incitec with C10 on loan at Gibson Island | Incitec |
2010 | Boyne Smelter Day Bin scans | Rio Tinto |
2010 | Gladston Cyanide Plant | Orica |
2010 | Shell Tank Farm | PCI |
2010 | Pinkenba heat Exchanger | PCI |
2010 | Newstead Tanks | Rocla Pipes |
2010 | QAL Pipe rack | QAL |
2010 | Yellowbank Gas Plant | Origin Energy |
2010 | Emu Apple Gas Plant | Origin Energy |
2010 | Wallumbilla | Origin Energy |
2010 | Peat Facility | Origin Energy |
2010 | Peak Downs Drag line boom | Wave Eng |
2010 | Tarong Dragline | Wave Eng |
2010 | Kincora Gas Plant | Origin Energy |
2010 | DRE09 Dragline Peak Downs | Downer |
2010 | HCP Surveys for Downer EDI | Downer |
2010 | Gasifier Scan inside deformation with C10 on loan | BOQ |
2010 | Curragh scans transformed to Plant Grid | Downer |
2009 | Gregory Mine CPP | Wave Eng |
2009 | Origin Gas Plants – Yandina | Origin Energy |
2009 | Brendale treatment Plant | Morteon Regional Council |
2009 | Boiler1 | QAL |
2009 | Yarwun Tailings Dam | RTA |
2009 | Caltex Tank 414 | Saunders International |
2009 | Crude Dock Bund Survey | BP |
2008 | Yatala Brewery | Taiyo |
2008 | Acland Coal Rejects Conveyor | Sedgman |
2008 | Greenbank Balance Tank | SRWP Alliance |
2008 | Molendinar Balance Tank | SRWP Alliance |
2008 | Stapylton Balance Tank | SRWP Alliance |
2008 | Edens Landing Fuel Depot | Rio Tinto |
2008 | Detail Product Wharf Pinkenba | BP |
2008 | Curragh CHPP | Wesfarmers |
2008 | Ulan CHPP Upgrade | Sedgeman |
2008 | Ulan CHPP | Sedgeman |
2008 | Tank 108 Kernell | Saunders International |
2008 | ATCOM CHPP South Africa/ Database management | Sedgman |
2008 | ATCTCOM Transfer Stations | Sedgman |
2007 | Vessel 2204F | BP |
2007 | Column 606E | BP |
2007 | 201D-204L Pump Alley | BP |
2007 | Vessel 101 | BP |
2007 | Brunswick Station Ceiling Scans | Qld Rail |
2007 | Ingham Chicken Processing Plan TOR | Inghams |
2007 | Visy Board plant shutdown | Visy |
2007 | Oceanic Pearl – Shed 4 – Hemmant | SeaLife Designs |
2007 | Bundaberg Mill | Bundaberg Sugar |
2006 | Sewer Pump Stn – Southport | Cardno MBK |
2006 | Thiess QR – Caboolture ( Roving Scan) | Thiess |
2006 | Pipe Measures | Tyco QNI |
2006 | Camerons Hill No 1 Reservoir | BCC |
2006 | Camerons Hill No 2 | BCC |
2006 | North Pine No 1 | BCC |
2006 | North Pine No 2 | BCC |
2006 | Sewage Pump Station | JWP |
2006 | Petrie Water Treatment | PRSC |
2006 | Minchinbury Reservoir As Con | Saunders |
2006 | As Con of Crude Oil Tank at BP Townsville | Saunders |
2005 | Riparian Plaza Awning – Scan of Steel work | G James Glass |
2005 | Original Scan of Riverside shaft | Mc Connell Dowel |
2005 | Second Scan of Riverside Shaft | Mc Connell Dowel |
2005 | Final scan of Riverside Shaft | Mc Connell Dowel |
2005 | BP Whinstanes – Tank WS8 | BP |
2005 | Saraji Process plant – Modelling 8635-020 | Aspec Engineering |
2005 | Boat Hull scans – 15m boat at Gilberts Slipway | SeaLife Designs |
2005 | Boat Hull scans – 15m boat at Bulimba | SeaLife Designs |
2005 | Swanbank Landfill | Theiss |
2005 | Copper Stockpile Townsville | B&M |
2005 | Gladstone QAL – Various site scans | QAL |
2005 | XXXX brewery | XXXX |
2005 | Caltex – Pipes at end of Wharf – for new Crude pipe. | Caltex |
2004 | Catalytic Converter Scanned inside | BP |
2004 | Catalytic Converter outside | BP |
2004 | Tank 612 Deformation | BP |
2004 | Gladstone QAL – Various site scans | QAL |
2004 | Fisherman Island – Coal Conveyor | SGS |
2004 | Caltex refinery shutdown | Caltex |
2004 | Caltex refinery shutdown | Caltex |
2004 | Saraji Process plant | Sedgman |
2004 | Second trip to Saraji | Sedgman |
2004 | Port of Brisbane Patricks | Fielders |
2004 | Hail Creek Process Plant | Sedgman |
2003 | Wet End Upgrade of Cardboard Plant | AMCOR |
2003 | I site data from Lorim Point | Bechtel |
2003 | Crude Tank 109 Deformation | BP |
2003 | Bund Area for Tank 218 | BP |
2003 | Gladstone Power Station Boiler 6 – redesign purposes | NRG |
2003 | Boiler 5 – Top Floor | NRG |
2003 | Boiler 1 | NRG |
2003 | Quantities for Dragline Buckets | Qld Uni |
2003 | Story Bridge | Storey Bridge Adventures |
2003 | Sandgate Treatment Plant | BWEA |
2003 | Stanwell Power Station | CBH |
2003 | BP Scan of Tank 109 for check of repair work | BP |
2002 | Electrical Sub-Station at the Gap | Energex |
2002 | Collapsed BCC Gas Bell at Luggage Point | BCC |
2002 | Francis Plant Detail Survey | Cardno MBK |
2002 | BCC Water – Mt Crosby | BCC |
2002 | Original Scans by John Damina of Gove | Alceng |
2002 | Plant Scans around Gove – Mill Slurry, Steam Power | Alceng |
2002 | Gladstone Power Station Boiler 6 | NRG |
2002 | Brendale Sub-Station | Energex |
2002 | Weipa – Calcination Kiln – Deformation – Axis alignment | Comalco |
2002 | Weipa – Scan of Conveyor Belt at Lorim Point | Bechtel |
2002 | Weipa Shiploader – Deformation of Shiploader Leg | Comalco |
2002 | QFRS – USAR Facility | QFRS |
2002 | QFRS Confined Spaces | QFRS |
2002 | Dragline DRE 39 at Blackwater | Team Engineering |
2002 | Dragline DRE 22 at Seraji | Team Engineering |
2002 | Dragline DRE 03 at Blackwater | Team Engineering |
2002 | Dragline DRE 40 at Peak Downs | Team Engineering |
2002 | Dragline DRE 17 at Peak Downs | Team Engineering |
2002 | Buckets BUD28 andf BUD75 | BHP |
2002 | Port Berth 8&9 – Wharf redevelopment | Maunsell |
2001 | Plant Scan of Paper Mill | AMCOR |
2001 | Scan of Material left in Sun metals storage Bins | Qld Zinc |