Projects

NorthGroup Consulting has over 30 years experience in a variety of disciplines over a diverse project history that can be demonstrated by the following examples:

Riverside Expressway – 3D Laser Scanning

NorthGroup Consulting were approached by TMR to consider the viability of scanning the Ramps of the Riverside expressway. The scope involved not only the external surfaces of the Riverside Expressway but also the internals of the Span Girders. Each of the insitu formed spans has 2 internal voids incorporated into their design as seen in

Bruce Highway Upgrade – Cooroy to Curra

NorthGroup Consulting were engaged by Queensland Transport and Main Roads (TMR) to perform accurate pre-design detail surveys on several packages within Sections C and D of the Bruce Highway Upgrade Project that is located between Cooroy and Curra in South-East Queensland. With short times frames required for completion of each package, several two man crews

Plant Scanning & Modelling Projects

2013 Caltex Alkylation Unit Scan (HF Mitigation Project) Caltex 2013 Springvale Coal CHPP Scan Sedgman 2013 Tank 512 Kurnell Giovenco 2013 Unity Sewer Pump Station Unity Water 2013 PNG Chiller Units VAE 2013 PNG Chiller Units VAE 2013 BP Transfield BP 2013 RTA Mill Chutes RTA 2013 Cyanide Dry Scrubber Orica Yarwun RTA 2013 Callide

Rail Infrastructure Surveying Projects

1992 – 1993 Set out and Detail Survey QR Mainline Upgrade Brisbane to Bundaberg QR Limited 1994 Setout and Detail Survey Lota Railway Station Redevelopment QR Limited 1994 – 2002 Construction Setout Deviaton Pegging at several locations QR Main line QR Limited 1995 Setout and Detail Survey Rail Line Kalimantan – Indonesia Connell Wagner Qld

Road & Route Infrastructure Surveying Projects

1986 Gateway Motorway (North), Project Surveyors for 25km of new Arterial road with multiple bridges and 6 major interchanges connecting the Bruce Highway at Bald Hills to the Gateway Bridge at Eagle Farm, services included pre-design surveys, audit survey for civil and construction works, volume calculations and progress reports 1988 Logan Motorway, Project Surveyor for

Town Planning & Cadastral Survey Projects

A Sample of Our Some Recent Projects: 2013 Kelvin Grove Business Park (Kelvin Grove) for Mariva Developments being an infill industrial unit development on a former landscape supplies site. 2012 Multi-Unit Development (Everton Hills) being a Multi Unit Development for 46 townhouses on a heavily constrained site with a waterway corridor and flood management requirements.

Airport Infrastructure Surveying Projects

2013 Construction works setout – Gladstone Airport Gibson Building Pty Ltd 2013 Virgin Rotunda Brisbane Airport Vac Group Pty Ltd 2012 BAC Security Screening GHD Pty Ltd 2012 Weipa Airport Surveys RTA Weipa Pty Ltd 2011 Hertz Brisbane Airport Construction Golder Associates Pty Ltd 2011 Redcliffe Aerodrome Levee Bank Surveys Auzcon Pty Ltd 2010 Sunshine

Over Water Infrastructure Surveying Projects

1995 Wharf Facility – Whyte island Seymour Whyte Constructions Pty Ltd 1996 Charter Cruise Terminal – Southbank Jetty Brisbane City Council 1998 Redcliffe Jetty Construction The Jetty Specialist 1999 Bretts Wharf (Stage 3) Hutchinsons Builders Pty Ltd 1999 BP Wharf Qport Marine Services Pty Ltd 2000 BP Wharf Enviromental Groundwater Consultants 2000 Mangrove rehabilitation Qport

Building & Construction Surveying Projects

2016 – 2018 Lucid Apartments, Southbank – 33 Levels Mirvac Constructions (Qld) Pty Ltd 2016 – 2017 Jupiters Casino Hotel, Broadbeach – 17 Levels Probuild Pty Ltd 2015 – 2017 SouthPoint Apartments, Southbank – 2 x 20 Levels Hutchinson Builders 2015 – 2017 Arthouse Apartments, Southbank – 28 Levels Mirvac Constructions (Qld) Pty Ltd 2015

Hydrographic Surveying Projects

A Sample of Our Hydrographic Surveying Projects: Mary River Flood Study A continuous 50km long-section and 100m interval cross-sections capturing the Mary River’s channel.  Data collected was combined into the State Government Flood Study of the entire Mary River system.  Two separate vessels were used for this survey due to the different conditions encountered between the upper